Circuit Breaker Auxiliary vs Alarm Contacts: OF, SD and SDE

OF reports breaker position. SD reports a trip. On supported models, SDE identifies an electrical fault trip. Use trip-unit diagnostics, where available, to investigate the specific cause.

What OF, SD and SDE report

In Schneider Electric’s ComPact NSX DC user guide, OF indicates main contact position. SD indicates a trip, including operation by a shunt trip or undervoltage release, the push-to-trip button, or the trip unit. SDE indicates a trip due to an electrical fault detected by the trip unit. These definitions describe the cited product and configuration. Other families can use different labels or support fewer functions.

What the operator needs to knowSignal to look forWhat to confirm
Is the breaker open or closed?Position indication, such as OFContact state in ON, OFF and tripped conditions
Did the breaker trip?Trip indication, such as SDWhich releases and test operations activate it
Did the trip unit detect an electrical fault?Electrical fault indication, such as SDEWhich protection functions activate the output

Example: a remote panel reports a breaker open

An open-position signal alone cannot establish why a feeder opened. In the documented ComPact NSX DC arrangement, an active SD signal distinguishes a trip from ordinary manual switching. The table shows logical indications, not PLC input levels. Verify the actual NO/NC terminals and input mapping for your installation.

Event or stateOF positionSD tripSDE electrical fault trip
Manual OFF with no active trip indicationOpenInactiveInactive
Shunt trip or undervoltage release operatesOpenActiveInactive
Trip unit detects an electrical fault and tripsOpenActiveActive
Trip reset, breaker still open and indications clearedOpenInactiveInactive

The last row can look identical to manual OFF at the PLC. Log and timestamp signal transitions to preserve the trip event. Use available trip-unit records to distinguish causes such as overload and short circuit.

Check compatibility before ordering

  1. Record the breaker series, frame, exact part number and any trip unit or release fitted.
  2. Check the accessory part number, mounting position and how many compatible slots are available. Schneider’s GV5PB/GV6PB documentation shows why mounting location can determine which signal an accessory provides.
  3. Match the contact’s voltage and current ratings to the control circuit. For a low current PLC input, check the specified minimum switching load where published. Verify NO and NC states from the device diagram.
  4. Document the expected input states for manual OFF, trip and reset. Have qualified personnel confirm the states with the manufacturer’s approved commissioning procedure and proper isolation. A PLC indication cannot establish that conductors are de-energized.

Can the signal distinguish a trip from a broken wire?

With a single dry contact input, a broken wire can look like an intentional contact opening. If the circuit signals an alarm by closing the contact, a broken wire can prevent the PLC from seeing a genuine trip. Where the operator must distinguish these states, specify a compatible supervised circuit. Include normal operation, a trip and a signal-loop break in the commissioning checks, and verify that each produces the intended indication.

What should a panel builder send to KUANGYA?

Send the breaker part number, desired events, control voltage, PLC input details and number of signals. Start with the AC circuit breaker range أو AC MCB range. For an application where source terminal orientation also matters, see our breaker reverse feed guide.

إيلين
إيلين

رئيس قسم التسويق في شركة كوانجيا، الذي يركز على الترويج العالمي لحلول الحماية الكهربائية وتوزيع الطاقة: بناء العلامة التجارية في أسواق الطاقة الكهروضوئية وتخزين الطاقة والطاقة الصناعية.● المنتجات الاحترافية: الصمامات، وأجهزة الحماية من زيادة التيار (SPD)، وقواطع الدوائر الكهربائية المصغرة (MCB)، ومفاتيح التحويل.● القيمة المقترحة: خدمة سوق الطاقة المتجددة العالمية مع "السلامة والموثوقية والابتكار" كأركان أساسية لدينا، مرحبًا بكم في التواصل والتعاون من أجل التقدم المشترك في تكنولوجيا توزيع الطاقة الذكية.

المقالات: 197