{"id":5015,"date":"2026-11-20T17:03:25","date_gmt":"2026-11-20T09:03:25","guid":{"rendered":"https:\/\/cnkuangya.com\/?p=5015"},"modified":"2026-11-20T17:03:31","modified_gmt":"2026-11-20T09:03:31","slug":"where-should-an-spd-go-in-a-generator-and-ats-system","status":"publish","type":"post","link":"https:\/\/cnkuangya.com\/fr\/blog\/where-should-an-spd-go-in-a-generator-and-ats-system\/","title":{"rendered":"O\u00f9 installer un parafoudre (SPD) dans un syst\u00e8me de g\u00e9n\u00e9rateur et d'inverseur de source (ATS) ?"},"content":{"rendered":"<figure><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/cnkuangya.com\/wp-content\/uploads\/2025\/09\/KYSPD-40T2-1P-3-600x600.webp\" alt=\"Kuangya Type 2 AC surge protective device; ATS application requires project-specific selection\" width=\"600\" height=\"600\"><figcaption>Example AC SPD product image. Its suitability for an ATS system depends on the actual electrical design and product documentation.<\/figcaption><\/figure>\n<p><strong>R\u00e9ponse rapide :<\/strong> An automatic transfer switch (ATS) does not make one upstream surge protective device (SPD) sufficient for both utility and generator operation. Review the utility entrance, generator-side distribution, ATS load side and vulnerable control or communication circuits as separate exposure points. The final locations and device ratings depend on the system grounding, voltage, fault level, local rules and equipment instructions.<\/p>\n<h2>Map the power paths before choosing a device<\/h2>\n<p>Draw both operating states: utility feeding the load and generator feeding the load. Mark the service equipment, generator output, ATS, downstream distribution boards, sensitive loads, grounding\/bonding points and control cables. A surge entering by one source can reach equipment through a different path than a surge entering by the other. Schneider Electric\u2019s <a href=\"https:\/\/www.se.com\/us\/en\/faqs\/FAQ000255143\/\" rel=\"noopener\">ATS application guidance<\/a> illustrates SPDs on the load sides of the service entrance, generator and transfer switch. It also discusses protection for exposed data and control circuits.<\/p>\n<p>This is a design example, not a universal wiring diagram. The <a href=\"https:\/\/cnkuangya.com\/fr\/ac-spd\/\">Kuangya AC SPD range<\/a> includes different types and pole arrangements, but no model should be specified without its exact datasheet and the site single-line diagram.<\/p>\n<h2>Placement scenarios<\/h2>\n<table>\n<thead>\n<tr>\n<th>Location to review<\/th>\n<th>Objectif<\/th>\n<th>Question de conception<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Utility\/service entrance<\/td>\n<td>Limit surges entering from the supply side<\/td>\n<td>What lightning exposure and upstream protection already exist?<\/td>\n<\/tr>\n<tr>\n<td>Generator-side distribution<\/td>\n<td>Address exposure associated with the generator supply path<\/td>\n<td>How is the generator neutral bonded and switched?<\/td>\n<\/tr>\n<tr>\n<td>ATS load side<\/td>\n<td>Protect loads regardless of the selected source<\/td>\n<td>Is the SPD connected at a suitable point with short, direct leads?<\/td>\n<\/tr>\n<tr>\n<td>Control and data circuits<\/td>\n<td>Protect ATS\/generator controls and remote signals<\/td>\n<td>Which signal protocol, voltage and cable route apply?<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Where a long outdoor control cable connects equipment at both ends, assess protection at each end using devices designed for that signal interface. An AC power SPD is not a substitute for a correctly specified signal-line SPD.<\/p>\n<h2>Type 1 vs Type 2: what changes at an ATS?<\/h2>\n<p>SPD type follows the installation point and expected surge duty under the applicable standard and local rules, not simply the fact that a panel contains an ATS. A service entrance with direct lightning-current exposure may call for a different device than a downstream distribution board. Compare the project requirements with the exact product classification, continuous operating voltage (Uc or MCOV), voltage protection level, nominal discharge rating, fault-current suitability and required backup protection. Review conductor arrangement and earthing system before choosing pole count or protection modes. Our <a href=\"https:\/\/cnkuangya.com\/fr\/blog\/3-1-vs-4-0-spd\/\">guide sur les parafoudres 3+1 vs 4+0<\/a> explains why wiring topology matters.<\/p>\n<p>Do not copy a 480Y\/277 V example rating into a 230\/400 V or ungrounded installation. For example, the <a href=\"https:\/\/cnkuangya.com\/fr\/produit\/type-2-surge-protection-device\/\">KYSPD-40T2-1P product page<\/a> describes a Type 2 AC device; its published parameters are a starting point for a model-specific review, not approval for every ATS location.<\/p>\n<h2>Documented application evidence<\/h2>\n<p>Schneider Electric\u2019s <a href=\"https:\/\/www.se.com\/ww\/en\/download\/document\/SPD-WP-50012-SPDATS\/\" rel=\"noopener\">white paper on SPDs in automatic transfer switches<\/a> and its ATS application FAQ provide the third-party placement example above. These documents are engineering guidance, not a claim that a specific Kuangya SPD has been tested in a named customer installation. Schneider\u2019s <a href=\"https:\/\/www.se.com\/us\/en\/faqs\/FAQ000233580\/\" rel=\"noopener\">generator SPD FAQ<\/a> also distinguishes recommendations from requirements that depend on the jurisdiction and emergency-system classification. We do not have a verified Kuangya customer case for this exact arrangement and therefore do not present a fabricated one.<\/p>\n<h2>Installation and procurement checklist<\/h2>\n<ol>\n<li>Obtain the utility\/generator\/ATS single-line diagram and both operating-state paths.<\/li>\n<li>Record system voltage, frequency, grounding, neutral switching and prospective short-circuit current at each proposed SPD point.<\/li>\n<li>Select the SPD type, Uc\/MCOV, protection modes and backup protection from the actual product instructions.<\/li>\n<li>Keep power and protective-earth connections short and direct, with bonding and conductor sizes per instructions.<\/li>\n<li>Check enclosure space, thermal conditions, status indication and access for replacement.<\/li>\n<li>Specify signal-line protection separately where controls or communications are exposed.<\/li>\n<li>Document commissioning checks and inspection responsibility after transfer or storm events.<\/li>\n<\/ol>\n<p>A qualified designer should also check coordination with other protection in the distribution system. For broader context see <a href=\"https:\/\/cnkuangya.com\/fr\/blog\/data-center-fire-protection-solutions\/\">layered protection for critical power systems<\/a> et le <a href=\"https:\/\/cnkuangya.com\/fr\/blog\/spd-manufacturer-documents-checklist\/\">SPD document checklist<\/a>.<\/p>\n<h2>Foire aux questions<\/h2>\n<h3>Can one SPD before the ATS protect loads on generator power?<\/h3>\n<p>Do not assume so. The generator supply path may bypass that point. Trace both source paths and review load-side protection.<\/p>\n<h3>Does the ATS itself provide surge protection?<\/h3>\n<p>Not unless its exact documentation specifies an integrated SPD and its ratings. Transfer switching and transient limitation are separate functions.<\/p>\n<h3>Is an SPD mandatory on every generator?<\/h3>\n<p>No universal answer applies. Check the jurisdiction, emergency-system classification and project specification. The cited Schneider guidance distinguishes common placements from code-triggered requirements.<\/p>\n<h3>What information should a buyer send Kuangya?<\/h3>\n<p>Provide the single-line diagram, supply and generator voltages, earthing arrangement, neutral switching, fault level, proposed SPD locations, installation environment and any signal-line interfaces. Request model-specific datasheets and wiring instructions before approval.<\/p>\n<p><strong>Author:<\/strong> xuwenru. This article is based on cited public technical guidance and is not a site-specific engineering approval or an account of an unverified customer installation.<\/p>","protected":false},"excerpt":{"rendered":"<p>O\u00f9 installer les parafoudres dans un syst\u00e8me compos\u00e9 d'un g\u00e9n\u00e9rateur et d'un inverseur de source automatique (ATS) ? Examinez l'emplacement c\u00f4t\u00e9 r\u00e9seau, c\u00f4t\u00e9 g\u00e9n\u00e9rateur, c\u00f4t\u00e9 charge de l'ATS et sur les circuits de commande, ainsi que les donn\u00e9es \u00e9lectriques n\u00e9cessaires \u00e0 une s\u00e9lection s\u00e9curis\u00e9e.<\/p>","protected":false},"author":7,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[35,42],"tags":[],"class_list":["post-5015","post","type-post","status-publish","format-standard","hentry","category-blog","category-surge-protection-lightning-safety"],"blocksy_meta":[],"_links":{"self":[{"href":"https:\/\/cnkuangya.com\/fr\/wp-json\/wp\/v2\/posts\/5015","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cnkuangya.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cnkuangya.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cnkuangya.com\/fr\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/cnkuangya.com\/fr\/wp-json\/wp\/v2\/comments?post=5015"}],"version-history":[{"count":1,"href":"https:\/\/cnkuangya.com\/fr\/wp-json\/wp\/v2\/posts\/5015\/revisions"}],"predecessor-version":[{"id":5016,"href":"https:\/\/cnkuangya.com\/fr\/wp-json\/wp\/v2\/posts\/5015\/revisions\/5016"}],"wp:attachment":[{"href":"https:\/\/cnkuangya.com\/fr\/wp-json\/wp\/v2\/media?parent=5015"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cnkuangya.com\/fr\/wp-json\/wp\/v2\/categories?post=5015"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cnkuangya.com\/fr\/wp-json\/wp\/v2\/tags?post=5015"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}