{"id":2533,"date":"2026-02-24T08:39:16","date_gmt":"2026-02-24T08:39:16","guid":{"rendered":"https:\/\/cnkuangya.com\/?p=2533"},"modified":"2026-10-28T16:12:22","modified_gmt":"2026-10-28T08:12:22","slug":"china-spd-factory-suggest-how-to-find-a-high-quality-dc-spd-manufacturer","status":"publish","type":"post","link":"https:\/\/cnkuangya.com\/de\/blog\/china-spd-factory-suggest-how-to-find-a-high-quality-dc-spd-manufacturer\/","title":{"rendered":"Wie man einen Hersteller f\u00fcr PV-DC-\u00dcberspannungsschutzger\u00e4te ausw\u00e4hlt: Checkliste f\u00fcr Lieferanten"},"content":{"rendered":"<p><strong>Kurze Antwort:<\/strong> A reliable PV DC surge protective device (SPD) supplier should be able to show a traceable datasheet, applicable test evidence, an installation diagram and a repeatable quality-control process for the exact model you plan to buy. Start with the electrical requirements of your project, then compare suppliers against the same checklist.<\/p>\n<h2>First define the PV application<\/h2>\n<p>Record the PV array&#8217;s maximum corrected open-circuit voltage, earthing arrangement, inverter input rating, lightning exposure, installation location and required SPD class. The DC side of a PV system is not interchangeable with an AC distribution circuit. IEC 61643-31:2018 sets requirements and tests for SPDs connected to the DC side of PV installations up to 1,500 V DC. IEC 61643-32:2017 addresses selection and application principles for PV SPDs. Check the editions and local adoption relevant to your market.<\/p>\n<p>IEC 61643-31 does not cover every DC application. Its published scope excludes PV systems with energy storage such as batteries. For an energy-storage or other DC system, ask which standard and test evidence apply to that specific circuit rather than assuming a PV SPD certificate covers it.<\/p>\n<h2>What to request from each DC SPD manufacturer<\/h2>\n<table>\n<thead>\n<tr>\n<th>Document or evidence<\/th>\n<th>Warum das wichtig ist<\/th>\n<th>Vergleichskriterien<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Model-specific datasheet<\/td>\n<td>Defines the ratings offered for the exact order code<\/td>\n<td>Ucpv, In, Imax, Iimp if Type 1, Up, Iscpv, poles and temperature range<\/td>\n<\/tr>\n<tr>\n<td>Test report or certificate<\/td>\n<td>Connects a declared standard to a tested product<\/td>\n<td>Model numbers, standard edition, issuing body, report date and scope<\/td>\n<\/tr>\n<tr>\n<td>Wiring and backup-protection instructions<\/td>\n<td>Supports safe application in the target system<\/td>\n<td>PV array configuration, disconnector, external fuse or breaker and conductor sizes<\/td>\n<\/tr>\n<tr>\n<td>Production quality records<\/td>\n<td>Shows whether output is checked consistently<\/td>\n<td>Incoming inspection, final test plan, lot traceability and nonconformity process<\/td>\n<\/tr>\n<tr>\n<td>Commercial and support terms<\/td>\n<td>Determines what happens if a batch fails or specifications change<\/td>\n<td>Warranty scope, replacement lead time, revision control and technical contact<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Do not treat a certificate image or a claim of \u201cIEC compliant\u201d as sufficient on its own. Match the certificate and report to the precise model, ratings and factory. Ask for clarification when the document identifies a different order code or an older construction.<\/p>\n<h2>Check the ratings in the right order<\/h2>\n<ol>\n<li><strong>Ucpv:<\/strong> verify maximum continuous operating voltage against the highest corrected PV array voltage under the site&#8217;s lowest expected temperature.<\/li>\n<li><strong>Type and impulse duty:<\/strong> determine whether Type 1, Type 2 or a combined product is required by the lightning risk assessment and installation design.<\/li>\n<li><strong>In, Imax and Iimp:<\/strong> compare values only when the test waveform and class are stated. A large kA figure alone does not identify the correct product.<\/li>\n<li><strong>Auf:<\/strong> coordinate the voltage protection level with the inverter or other protected equipment&#8217;s withstand capability, allowing for installed connection length.<\/li>\n<li><strong>Iscpv and disconnection:<\/strong> confirm the declared PV short-circuit capability, internal disconnector and any required external backup protection.<\/li>\n<li><strong>Connection and environment:<\/strong> verify pole arrangement, protective earthing, enclosure, temperature and service access for the actual site.<\/li>\n<\/ol>\n<p>For system-level placement, compare the supplier&#8217;s proposed arrangement with <a href=\"https:\/\/cnkuangya.com\/de\/blog\/solar-inverter-protection\/\">PV inverter protection on both the DC and AC sides<\/a>. A DC-side PV SPD does not replace overcurrent protection, an isolator or an AC-side SPD.<\/p>\n<h2>How to qualify the factory without relying on marketing claims<\/h2>\n<h3>1. Screen the documents<\/h3>\n<p>Send the same requirement sheet to each candidate. Ask for the exact model datasheet, current installation instructions and test evidence. Reject unexplained gaps between the quotation, label, datasheet and certificate. A supplier that identifies a mismatch and proposes a documented alternative is more useful than one that agrees to every requested rating.<\/p>\n<h3>2. Review quality controls<\/h3>\n<p>Ask how incoming components, assembly changes and final inspection are recorded. If an audit is possible, sample one finished lot and trace it through inspection records and bill-of-material revisions. The appropriate test equipment and acceptance criteria depend on the product design; there is no universal generator size, component purity percentage or response-time threshold that proves all DC SPDs are good.<\/p>\n<h3>3. Validate a sample against the paperwork<\/h3>\n<p>Check the delivered label and terminals against the approved drawing. Have qualified personnel review the wiring instructions, status indicator, cartridge arrangement and specified backup device. Use an independent laboratory when a project or market requires third-party verification. Keep the approved sample and document revision as the baseline for later shipments.<\/p>\n<h3>4. Agree on change control<\/h3>\n<p>Define how the supplier will notify you of component, circuit, enclosure or labeling changes. Request batch identification and a practical process for investigating field failures. These controls matter more than unsupported promises about zero failures or an arbitrary number of years in business.<\/p>\n<h2>Questions to send with your RFQ<\/h2>\n<ul>\n<li>Which exact model and standard edition does the test evidence cover?<\/li>\n<li>What are Ucpv, In, Imax, Up and Iscpv for that order code?<\/li>\n<li>If Type 1 is proposed, what is the declared Iimp and waveform?<\/li>\n<li>What fuse or circuit breaker is required, if any, and under what fault-current conditions?<\/li>\n<li>Which connection diagram applies to our PV earthing arrangement?<\/li>\n<li>How are product revisions and production lots identified?<\/li>\n<li>Which documents and technical support are available after shipment?<\/li>\n<\/ul>\n<h2>Compare a real product, then verify the documents<\/h2>\n<p>Kuangyas <a href=\"https:\/\/cnkuangya.com\/de\/dc-spd\/\">DC SPD range<\/a> provides a starting point for comparing PV voltage and device classes. For a quotation, <a href=\"https:\/\/cnkuangya.com\/de\/contact-us\/\">send your project requirements<\/a> and request the current datasheet, wiring diagram and evidence for the exact proposed model. Apply the same checks to Kuangya and every competing supplier.<\/p>\n<p><strong>Standards referenced:<\/strong> <a href=\"https:\/\/webstore.iec.ch\/en\/publication\/26931\" rel=\"noopener\">IEC 61643-31:2018<\/a> und <a href=\"https:\/\/webstore.iec.ch\/en\/publication\/30774\" rel=\"noopener\">IEC 61643-32:2017<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>A practical checklist for qualifying a PV DC SPD manufacturer: confirm IEC 61643-31 scope, model-specific ratings, test evidence, traceability and installation instructions.<\/p>","protected":false},"author":4,"featured_media":2498,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[42],"tags":[],"class_list":["post-2533","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-surge-protection-lightning-safety"],"blocksy_meta":[],"_links":{"self":[{"href":"https:\/\/cnkuangya.com\/de\/wp-json\/wp\/v2\/posts\/2533","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cnkuangya.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cnkuangya.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cnkuangya.com\/de\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/cnkuangya.com\/de\/wp-json\/wp\/v2\/comments?post=2533"}],"version-history":[{"count":2,"href":"https:\/\/cnkuangya.com\/de\/wp-json\/wp\/v2\/posts\/2533\/revisions"}],"predecessor-version":[{"id":4872,"href":"https:\/\/cnkuangya.com\/de\/wp-json\/wp\/v2\/posts\/2533\/revisions\/4872"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cnkuangya.com\/de\/wp-json\/wp\/v2\/media\/2498"}],"wp:attachment":[{"href":"https:\/\/cnkuangya.com\/de\/wp-json\/wp\/v2\/media?parent=2533"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cnkuangya.com\/de\/wp-json\/wp\/v2\/categories?post=2533"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cnkuangya.com\/de\/wp-json\/wp\/v2\/tags?post=2533"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}